Programmatic Builder

Concept-stage cost, schedule and massing for AI / hyperscale data center campuses. Answer four short steps; the estimate updates as you type.

AACE Class 4 concept estimate
Pricing basis Q4 2026

Concept Data Center

U.S. data center market

About 225 major U.S. campuses by status and planned capacity. The dashed circle marks a 150-mile radius around the selected market. Hover or tap a circle for details.

Campuses near the project

Compiled from public reporting, updated October 21, 2026. Capacity is full planned campus MW, not energized load; "est." marks estimated figures. Status can lag what is happening on site. Contested sites face lawsuits, moratoriums, referendums or permit challenges.

Building 1 cost build-up

Direct cost by system, then the contractor's indirect stack in standard order.

Concept massing

Parametric model sized to Building 1: overall building, each level, site plan and site logistics plan. Drag to orbit; use the tabs inside the viewer.

Program schedule & cost

Building 1 carries the full estimate. Buildings 2+ apply the site factor to site development, then escalate to each building's construction midpoint.

Total development cost

Owner's view: all-building construction plus campus infrastructure, soft costs, land and owner contingency. Excludes IT equipment.

Building 1 cash flow

Monthly spend on a typical construction S-curve, from NTP to ready for service.

Long-lead procurement

Order-by dates back-scheduled from each item's install month: submittal approval, manufacturing lead time, transit and a required-on-site buffer. Status is against today's date.

Market comparison

The same Building 1 priced in each market, shown as construction $ per IT MW.